Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 11 results ...

Amir, T (1986) Transient Response Analysis of a Dual Cycle System. Journal of Construction Engineering and Management, 112(03), 403–10.

Arditi, D and Albulak, M Z (1986) Line‐of‐Balance Scheduling in Pavement Construction. Journal of Construction Engineering and Management, 112(03), 411–24.

  • Type: Journal Article
  • Keywords: Highway and road construction; Pavements; Project management; Scheduling;
  • ISBN/ISSN: 0733-9364
  • URL: https://doi.org/10.1061/(ASCE)0733-9364(1986)112:3(411)
  • Abstract:
    Linear Scheduling Methods are best suited to projects that display repetitive characteristics, but their use in the construction industry is limited. Line‐of‐Balance (LOB) is a Linear Scheduling Method that also makes use of network technology. Its benefits and shortcomings are investigated in a high‐way surface treatment project where LOB has been used experimentally. It was determined that LOB is extremely sensitive to errors in man hour, crew size, and activity duration estimates. There are also problems of a visual nature with the presentation of the diagram. On the other hand, LOB allows a better grasp of the project than any other scheduling technique because it is possible to adjust activities' rates of production. It provides a smooth and efficient flow of resources and requires less time and effort to produce than network schedules. Research to make Linear Scheduling Methods more attractive is recommended.

Bresnen, M J, Bryman, A E, Ford, J R, Beardsworth, A D and Keil, T E (1986) Leader Orientation of Construction Site Managers. Journal of Construction Engineering and Management, 112(03), 370–86.

Handa, V K and Barcia, R M (1986) Linear Scheduling Using Optimal Control Theory. Journal of Construction Engineering and Management, 112(03), 387–93.

Herbsman, Z (1986) SERC—A Model for Estimating Construction Inputs. Journal of Construction Engineering and Management, 112(03), 425–39.

Kagan, H A, Leary, D J and Pratter, G E K (1986) Design Engineers' Responsibilities During Construction. Journal of Construction Engineering and Management, 112(03), 394–402.

Karaa, F A and Nasr, A Y (1986) Resource Management in Construction. Journal of Construction Engineering and Management, 112(03), 346–57.

Thomas, H R and Bluedorn, A C (1986) Case Study of Organizational Changes. Journal of Construction Engineering and Management, 112(03), 358–69.

W. L., S, Rybel, V W and Cochran, L (1986) Dewatering for Opal Springs Powerhouse Excavation. Journal of Construction Engineering and Management, 112(03), 440–51.

William C., I (1986) Future Directions for Computerized Construction Research. Journal of Construction Engineering and Management, 112(03), 326–45.

Wong, T K and Logcher, R D (1986) Contractors in Cyclical Economic Environments. Journal of Construction Engineering and Management, 112(03), 310–25.